5. How to calculate area of shop floor?
18. Purpose of line balancing?
19. In Microsoft Excel, if you want to change the colour of a cell according to the values in it, which of the below will you choose?
22. What is the average of 22.46, 34.78, 41.67, 65.45 and 22.98?
24. A assembly line has 4 operations and it's cycle times are 4.5 sec, 6.7 sec, 5.4 sec and 5.9 sec. In line balancing problem what is the line balancing efficiency?
25. What should be the ultimate aim of an Industrial Engineer?
27. A process of a product requires a machine, demand of the product is 50 nos per day, cycle time of the process is 2.5 minutes, machine runs for 3 shift for 420 minutes each. What is the expected utilization of that machine per day?
29. No of good products produced in a machine in a shift is 2500, ideal cycle time is 2.5 seconds, planned production time is 420 minutes, What is OEE?
30. A assembly line has 4 operations and it's cycle times are 4.5 sec, 6.7 sec, 5.4 sec and 5.9 sec. What is the output per hour?
As an Industrial Engineer i enjoyed the test.