Industrial Engineering Online Exam

Welcome to Online exam for testing skills of an Industrial Engineering professional

 

Your Full Name
Your E mail
WhatsApp Number (with country code)
1. 
Normal time is 4.67 minutes, relaxation allowance is 11% and other allowance is 3%. Calculate Standard Time.

2. 
Meaning of word Kaizen

3. 
Convert 375658 cm square to square feet

4. 
In a Time Study observed time is 3.45 minutes, rating factor is 120. What is the Normal time?

5. 
How to calculate area of shop floor?

6. 
What is the command for trim tool in Autocad?

7. 
Two people will be needed to carry a box from one place to other and time required will be 3.7 minutes. What is the man minutes?

8. 
4 persons should work together to complete a process on a product. What is the Manning of that process?

9. 
What is the 4th phase in 5S methodology?

10. 
A customer wants 500 products per day. A plant works in 2 shifts and working time per shift is 420 minutes. What is the takt time?

11. 
If you want to get the maximum value from a list of numbers in excel, which function wi you use?

12. 
What is the next step after collecting observed times in a Time Study?

13. 
Suppose there are two columns A and B in Microsoft Excel and if you want to find a value in column B corresponding to value in column A, which function will you use?

14. 
Which of the following tool is used for finding root cause of a problem?

15. 
If you want to move an object from one place to other in Autocad, which command will you type?

16. 
In Microsoft Excel, which character starts with a formula?

17. 
A machine produces 45 products per day, calculate no of days required to complete the work order of 799 products ?

18. 
Purpose of line balancing?

19. 
In Microsoft Excel, if you want to change the colour of a cell according to the values in it, which of the below will you choose?

Add description here!

20. 
Takt time of a product is 0.5 minutes and the cycle time of a process is 4.25 minutes, calculate no of workstation for that process?

21. 
Normally which time should be considered for manpower analysis and capacity analysis?

22. 
What is the average of 22.46, 34.78, 41.67, 65.45 and 22.98?

23. 
A person is traveling in a car with an average speed of 45 km/hour. His destination is 159 km away. How time will he take to reach his destination?

24. 
A assembly line has 4 operations and it's cycle times are 4.5 sec, 6.7 sec, 5.4 sec and 5.9 sec. In line balancing problem what is the line balancing efficiency?

25. 
What should be the ultimate aim of an Industrial Engineer?

26. 
How to turn on ortho mode in Autocad?

27. 
A process of a product requires a machine, demand of the product is 50 nos per day, cycle time of the process is 2.5 minutes, machine runs for 3 shift for 420 minutes each. What is the expected utilization of that machine per day?

28. 
If you want to provide a drop-down list in a cell of Microsoft excel, which of the following will you choose?

Add description here!

29. 
No of good products produced in a machine in a shift is 2500, ideal cycle time is 2.5 seconds, planned production time is 420 minutes, What is OEE?

30. 
A assembly line has 4 operations and it's cycle times are 4.5 sec, 6.7 sec, 5.4 sec and 5.9 sec. What is the output per hour?