Takt Time

Advertisements

Takt time is the time in which a manufacturer should produce a product so as to satisfy customer demand. This can be called as pulse of lean manufacturing.

How to calculate Takt time

Suppose a manufacturer have a customer who wants 500 units per day. Presently the manufacturer works in two shifts and working time per shift is 420 minutes. Here takt time can be calculated as follows.

No of units to be produced per shift = 500/2

                                                       = 250 nos

Takt time = 420/250

                  = 1.68 minutes.

This means the manufacturer should produce a unit in every 1.68 minutes of his production time.

We have developed an takt time calculator, for easy calculations. Have a look.

So the formula for takt time is, working time per shift / demand per shift

Please note that working time per shift is excluding the time for lunch break, tea break and planned maintenance time, if any.

Uses of takt time

Free Training & Certification on Factovare Capacity Module FCMEP training participant sharing that she learned a lot FCMEP training where the founder is the trainer Factovare is looking for implementation partners Factovare Channel Partner Opportunity Factovare Work Life Balance for Manufacturing Professionals
Factovare
One Month Free Trial

See how Factovare helps factories digitize work

Watch the demo and contact us to try Factovare for your manufacturing operations.

FCMEP Three-Month Programme Registration

Factovare Certified Manufacturing Excellence Professional (FCMEP)

Who is the trainer?

Trainer: Founder of Factovare and Know Industrial Engineering

Learn directly from the person behind both platforms.

Foundation session

Any one Tuesday · 1 hour

Trainer: Founder of Know Industrial Engineering and Factovare.

Doubt clearance

Alternate Thursdays · 09:00 PM IST · 1 hour

Trainer: Founder of Know Industrial Engineering and Factovare. Attend every eligible session during your active period.

Self-learning access

Three months of guided practice

Use selected Factovare modules and protected training materials to learn and practise throughout the programme.

You may attend any one Tuesday foundation session. Your three-month programme starts on the date you attend your first foundation session. From that date, you can self-learn using the training materials and eligible Factovare modules, and attend all eligible alternate-Thursday doubt-clearance sessions.

What you will learn

Next live session loading...
Manpower Calculation
Resource Requirement Calculation
Space Requirement Calculation
Line Balancing
Time Study
SWCT
PMTS
Production Tracking
Production Monitoring & Insights
Product Costing
Work Instructions
Production Planning & Capacity Analysis

Enter your details, verify your email and complete the one-time $29 USD payment to join the three-month programme.

1 Details
2 OTP
3 Phone
4 Confirm

Step 1: Enter your name and email address, then click Send OTP.

We will send a one-time password to this email.

Quick security check, then try again.

This gives a target to the manufacturer to align all his all operation within 1.68 minutes. Otherwise he cannot satisfy his customer demand.

Takt time is used for balancing the assembly line. You can read the article on line balancing for knowing more about it.

Another application of takt time is to calculate the no of work station required in an assembly line. This is described in the article how to calculate no of work station from takt time.

You can also note one more point, if bottleneck cycle time in a assembly line is below takt time the assembly line can satisfy its customer demand. If not, it will not meet customer demand and bottleneck need to be reduced to below takt time.

Thank You for reading and supporting.

If you know any subject that can be related to manufacturing industry or industrial engineering, you can earn some income by becoming article contributor of this website. For knowing more about it, please visit Join us page.

You don’t need to have any experience in article writing, just knowledge on the subject is needed.

Also you can know more about our team of article contributors by visiting the about us page.

Now or Never

We’ve got your back on your manufacturing journey — Stay in touch

Follow us for step-by-step guidance, templates, and insights that save time and reduce mistakes.

Know Industrial Engineering Platform – Helping manufacturing industry professionals worldwide since 2019

Advertisements

Leave a Comment

Your email address will not be published. Required fields are marked *