How to do capacity analysis for manufacturing

In this article we will discuss basics of capacity analysis. After reading this article you will be able to do capacity analysis for a manufacturing plant.

I got a request in for uploading this article in the page, ‘request an article’. Hence this article.

Advertisement

Ok lets move forward.

What is capacity

Capacity means ability to do something. In case of manufacturing industry, ability to manufacture a particular quantity of products in a particular time duration.

That’s all….

Pretty simple right?

Yes it is…

What is capacity analysis

Capacity analysis is basically an analysis done to check whether a manufacturing plant can produce a particular no of products in a given period, with available no of resources.

Normally capacity analysis is done on machines or equipment.

There will two outcome of this analysis, either there is capacity or no.

If no, how much more machines need to be added, is also a outcome of capacity analysis.

Very important analysis right?

Ok. Let’s how to do capacity analysis.

How to do capacity analysis

We will learn this through an example..

A manufacturing plant need to produce 150 units per day and we need to do capacity analysis.

And suppose this products requires two operations A and B and its standard times are 5.7 minutes and 8.9 minutes respectively.

Standard times are calculated by a method called time study.

And also operation A and B use two machines X and Y respectively. And presently have one each.

Working time of this plant is 420 minutes per shift (excluding breaks) and this plant operates three shifts per day.

Also on an average 30 minutes is required for both machines for maintenance, down time, change overs, etc.

Also 98% is the yield of the both machines.

Also these two machines is only able to run at 85% efficiency of its standard speed, due to its minor stoppages.

Now let’s calculate.

Considering the minor speed loss, cycle time per product for both machines will be 5.7/(0.85) and 8.9/(0.85) minutes, respectively.

Which is 6.71 and 10.47 respectively.

Get KIE Premium to Continue Reading

Don’t stop at half the knowledge. Complete what you started and keep building the skills that can move your work and career forward.

One membership. Every complete KIE article. Instant Activation.Continue this article now and keep full access for 365 days.

Now or Never

We’ve got your back on your manufacturing journey — Stay in touch

Follow us for step-by-step guidance, templates, and insights that save time and reduce mistakes.

Know Industrial Engineering Platform – Helping manufacturing industry professionals worldwide since 2019

6 thoughts on “How to do capacity analysis for manufacturing”

  1. Charles Connolly

    For a yield sensitive process, your use of (1+(1-yield)) as a factor will leave you short. Refer back to your Operations Management classes.

  2. Hi Sir, shall we consider the RTY? In this example, the yield for Machine A & B are 98%, the demand for Machine A should be 150 x 1.02 x 1.02 =156.06 (~157)

  3. If you have a moment please email me. I have a few questions on your steps to solve this capacity process.