First Pass Yield calculation formula

Advertisements
Quick Manufacturing Challenge from Know Industrial Engineering
Think before you answer

WIP is continuously accumulating before one operation. What should you investigate first?

Takeaway: Check whether the downstream operation is acting as the process constraint.

Please refer the picture below for first pass yield calculation formula.

First pass yield calculation formula

Also it’s assumed that all failed products after rework are scrapped.

You may read more article on this subject for knowing more about this subject. Link to those article shared below.

First Pass Yield (FPY)

Throughout Yield (TY)

Rolled Throughput Yield (RTY)

Difference between First Pass Yield and First Time Yield

Thank you.

Now or Never

We’ve got your back on your manufacturing journey — Stay in touch

Follow us for step-by-step guidance, templates, and insights that save time and reduce mistakes.

Free Training & Certification on Factovare Capacity Module FCMEP training participant sharing that she learned a lot FCMEP training where the founder is the trainer Factovare is looking for implementation partners Factovare Channel Partner Opportunity Factovare Work Life Balance for Manufacturing Professionals
Factovare
One Month Free Trial
See how Factovare helps factories digitize work
Watch the demo and contact us to try Factovare for your manufacturing operations.

Know Industrial Engineering Platform – Helping manufacturing industry professionals worldwide since 2019

Advertisements

Leave a Comment

Your email address will not be published. Required fields are marked *